San Marcos Dr over Drainage Ditch
0.6 Mi W of Community Dr · County 291, Texas · Built 2019 · 4 Lanes · 300 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.152222, -95.054417
This bridge is in worse condition than 38.3% of bridges in County 291. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
Community Dr over Drainage Ditch
Built 2019
CR 5260 over Drainage Ditch
Built 2018
Miller Wilson Rd over Drainage Ditch
Built 2022
SH 99 WBML over Miller Wilson Road
Built 2021
SH 99 EBML over Miller Wilson Road
Built 2021
SH 99 over Community Drive Rd.
Built 2021
Community Dr over Drainage Ditch
Built 2022
SH 99 SB On-Ramp over Drainage Ditch
Built 2022
SH 99 over Luce Bayou
Built 2021
Community Dr over Drainage Ditch
Built 2019
Bridge Details
- Structure #
- 201460AA6495004
- Year Built
- 2019
- Length
- 8.8 m (28.9 ft)
- Max Span
- 1.8 m
- Lanes
- 4
- Daily Traffic
- 300
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.