SH 99 over DAYTON CANAL

0.75 MI SE OF US 90 · County 291, Texas · Built 2022 · 5 Lanes · 3,800 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
201460351009335
Year Built
2022
Length
17.4 m (57.1 ft)
Max Span
3.4 m
Lanes
5
Daily Traffic
3,800
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.