3RD STREET over ATLANTIC CANAL

0.6 MI SE FM 366 · County 245, Texas · Built 2020 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
201240F00120009
Year Built
2020
Length
10.7 m (35.1 ft)
Max Span
10.7 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.