IH 10 EB and WB over North Fork Taylors Bayou
8.2 MI NE of SH 73 · County 245, Texas · Built 2020 · 4 Lanes · 42,138 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.911814, -94.292922
This bridge is in worse condition than 30.9% of bridges in County 245. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
SH 124 over N FORK TAYLOR BAYOU
Built 1937
SH 124 over DRAIN
Built 1937
SH 124 over DRAIN
Built 1937
FM 365 over IH 10
Built 1962
SH 124 over DRAIN
Built 1937
FM 365 over DRAW
Built 1951
IH 10 over South Fork Taylor Bayou
Built 2022
IH 10 NFR over SOUTH FORK TAYLORS BAYOU
Built 1962
IH 10 over Drainage Ditch
Built 2024
IH 10 EB over DRAINAGE DITCH
Built 1961
Bridge Details
- Structure #
- 201240073902445
- Year Built
- 2020
- Length
- 167.6 m (549.9 ft)
- Max Span
- 45.7 m
- Width
- 35.4 m (116.1 ft)
- Lanes
- 4
- Daily Traffic
- 42,138
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.