SH 105 over PINE ISLAND BAYOU

6.55 MI W OF US 69 · County 245, Texas · Built 1997 · 5 Lanes · 10,350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
201240033905017
Year Built
1997
Length
153.9 m (504.9 ft)
Max Span
23.5 m
Width
26.2 m (86 ft)
Lanes
5
Daily Traffic
10,350
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.