US 69 NB FR over Magnolia Petrol Co Canal

0.4 MI W OF SPUR 380 · County 245, Texas · Built 1963 · 3 Lanes · 800 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
201240020014071
Year Built
1963
Length
7.6 m (24.9 ft)
Max Span
3 m
Lanes
3
Daily Traffic
800
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.