IH 10 EB On-Ramp over R.O.W.

0.5 MI W OF ORANGE C/L · County 245, Texas · Built 2016 · 1 Lanes · 3,335 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
201240002809506
Year Built
2016
Length
44.8 m (147 ft)
Max Span
44.8 m
Width
8.2 m (26.9 ft)
Lanes
1
Daily Traffic
3,335
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.