FM 252 over TROUT CREEK

1.30 MI NW OF FM 1013 · County 241, Texas · Built 1965 · 2 Lanes · 1,099 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
201220078501008
Year Built
1965
Length
15.9 m (52.2 ft)
Max Span
2.4 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
1,099
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.