SH 105 over JACKSON CREEK

1.75 MI W OF SH 326 · County 199, Texas · Built 1953 · 2 Lanes · 6,666 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
201010033903009
Year Built
1953
Reconstructed
1995
Length
21.3 m (69.9 ft)
Max Span
3 m
Width
15.3 m (50.2 ft)
Lanes
2
Daily Traffic
6,666
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.