US 69 SB over PINE ISLAND BAYOU
2.4 MI S OF SH 105 · County 199, Texas · Built 1963 · 2 Lanes · 23,403 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
30.179114, -94.186211
This bridge is in worse condition than 77.8% of bridges in County 199. The average bridge in Texas is 0 years old; this one is 63 years old.
Nearby Bridges
US 69 NB over PINE ISLAND BAYOU
Built 1953
US 69 SBFR over PINE ISLAND BAYOU
Built 2018
US 69 NBFR over PINE ISLAND BAYOU
Built 2018
OLD VOTH ROAD over LNVA CANAL
Built 1960
US 69 NB over TRAM RD
Built 1981
US 69 SB over TRAM RD
Built 1981
TRAM ROAD over LNVA BI CANAL
Built 1960
US 69 over COOKS LAKE RD
Built 1988
COOKS LAKE ROAD over VILLAGE SLOUGH
Built 1993
TRAM ROAD over WALKER BRANCH
Built 1959
Bridge Details
- Structure #
- 201010006506067
- Year Built
- 1963
- Reconstructed
- 1981
- Length
- 190.8 m (626 ft)
- Max Span
- 24.4 m
- Width
- 14.9 m (48.9 ft)
- Lanes
- 2
- Daily Traffic
- 23,403
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.