SH 99 NB over FM 565
1.7 MI S of SH 146 · County 071, Texas · Built 2022 · 2 Lanes · 2,700 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
29.853258, -94.872669
This bridge is in worse condition than 26.4% of bridges in County 071. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
SH 99 SB over FM 565
Built 2022
LANGSTON BLVD over HACKBERRY GULLY
Built 2021
SH 99 over LANGSTON DR
Built 2022
SH 146 over IRRIGATION CANAL
Built 1944
LANGSTON BOULEVARD over HACKBERRY PARK LAKE
Built 2021
SH 99 over SH 146
Built 2022
PERRY AVE over COTTON BAYOU
Built 2015
Eagle Dr over DRAIN
Built 1986
SH 146 over DRAW
Built 1990
IH 10 WB FR over HACKBERRY GULLY
Built 2004
Bridge Details
- Structure #
- 200360351010264
- Year Built
- 2022
- Length
- 64.3 m (211 ft)
- Max Span
- 37.5 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 2,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.