SH 146 over SMITHS GULLY

0.4 MI N OF IH 10 · County 071, Texas · Built 1943 · 5 Lanes · 24,491 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
200360038902027
Year Built
1943
Reconstructed
1990
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
25.6 m (84 ft)
Lanes
5
Daily Traffic
24,491
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.