SH 124 over DRAW

0.2 MI N OF SH 65 · County 071, Texas · Built 1968 · 4 Lanes · 8,768 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
200360036801040
Year Built
1968
Length
7 m (23 ft)
Max Span
2.1 m
Lanes
4
Daily Traffic
8,768
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.