SH 124 over LITTLE ELM BAYOU

1.5 MI S OF FM 1941 · County 071, Texas · Built 1960 · 2 Lanes · 2,398 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
200360036701020
Year Built
1960
Length
18.6 m (61 ft)
Max Span
9.1 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
2,398
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.