US 259 over CLARK BRANCH

1.15 MI S OF SH 154 · County 459, Texas · Built 2001 · 5 Lanes · 12,862 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
192300039202050
Year Built
2001
Length
18.9 m (62 ft)
Max Span
3 m
Lanes
5
Daily Traffic
12,862
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.