CR 4550 over HART CREEK
2.5 MI E OF US271(VIA4530 · County 449, Texas · Built 2022 · 2 Lanes · 81 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.094128, -94.944442
This bridge is in worse condition than 51.9% of bridges in County 449. The average bridge in Texas is 0 years old; this one is 4 years old.
Nearby Bridges
US 271 over FM 3417
Built 2018
US 271 over BIG CYPRESS CREEK
Built 1989
US 271 over SW 48 STREET
Built 2014
US 271 over US 271 WFR UPRR CR2040
Built 2014
FM 4000 over HART CREEK
Built 2015
FM 3417 over TANKERSLEY CREEK
Built 1982
FM 3535 over US 271
Built 2009
US 271 over FM 4000
Built 2014
FM 4000 over UNION PACIFIC RR
Built 2015
US 271 over WALKERS CREEK
Built 2009
Bridge Details
- Structure #
- 192250AA4550001
- Year Built
- 2022
- Length
- 19.8 m (65 ft)
- Max Span
- 19.8 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 81
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.