PUBLIC RD. FM 726 over LAKE O THE PINES SPILLWY

LAKE O THE PINES DAM · County 315, Texas · Built 1957 · 2 Lanes · 82 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 5 Fair
Substructure 5 Fair

Location

32.751194, -94.499797

This bridge is in worse condition than 89.8% of bridges in County 315. The average bridge in Texas is 0 years old; this one is 69 years old.

Nearby Bridges

Bridge Details

Structure #
19155AA0292001
Year Built
1957
Length
65.7 m (215.6 ft)
Max Span
22.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
82
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Corps of Engineers (Civil)
Last Inspected
N/A
Est. Improvement
$513,000
Total Project Cost
$770,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.