FM 726 over COPELAND CREEK

1.45 MI E OF FM 450 S · County 203, Texas · Built 2024 · 2 Lanes · 738 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

32.743333, -94.609611

This bridge is in worse condition than 47.2% of bridges in County 203. The average bridge in Texas is 0 years old; this one is 2 years old.

Nearby Bridges

Bridge Details

Structure #
191030189502006
Year Built
2024
Length
36.6 m (120.1 ft)
Max Span
21.3 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
738
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.