LP 281 NB over IH 20

3.10 MI S OF US 80 · County 203, Texas · Built 1966 · 2 Lanes · 6,530 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
191030049508267
Year Built
1966
Length
81.4 m (267.1 ft)
Max Span
21.3 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
6,530
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$19,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.