SH 43 over POTTERS CREEK

2.5 MI S OF IH 20 · County 203, Texas · Built 1930 · 4 Lanes · 3,235 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
191030020705010
Year Built
1930
Reconstructed
1966
Length
43.6 m (143 ft)
Max Span
8.8 m
Width
16.9 m (55.4 ft)
Lanes
4
Daily Traffic
3,235
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.