US 80 over UNION PACIFIC RAILROAD

2.25 MI W OF US 59 · County 203, Texas · Built 1988 · 5 Lanes · 10,414 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
191030009609096
Year Built
1988
Length
106.7 m (350.1 ft)
Max Span
35.1 m
Width
24.9 m (81.7 ft)
Lanes
5
Daily Traffic
10,414
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.