FINDLEY ST over SOUTH WAGNER CREEK

0.8 MI W OF SH 93 · County 037, Texas · Built 1973 · 2 Lanes · 464 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
190190B00875001
Year Built
1973
Length
9.4 m (30.8 ft)
Max Span
9.1 m
Width
9.7 m (31.8 ft)
Lanes
2
Daily Traffic
464
Material
Prestressed Concrete
Design
Other
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.