SH 98 over ANDERSON CRK RELIEF

2.60 MI N OF US 67 · County 037, Texas · Built 2023 · 2 Lanes · 1,662 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
190190033001141
Year Built
2023
Length
45.7 m (149.9 ft)
Max Span
18.3 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
1,662
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.