SH 93 over HOWARD CREEK

0.65 MI NE OF US 59 · County 037, Texas · Built 1926 · 5 Lanes · 7,770 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
190190021801002
Year Built
1926
Reconstructed
1961
Length
13.4 m (44 ft)
Max Span
2.4 m
Width
26 m (85.3 ft)
Lanes
5
Daily Traffic
7,770
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.