SH 309 over RUSH CREEK RELIEF

2.2 MI S OF SH 31 · County 349, Texas · Built 2019 · 2 Lanes · 1,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

32.105122, -96.209711

This bridge is in worse condition than 24.9% of bridges in County 349. The average bridge in Texas is 0 years old; this one is 7 years old.

Nearby Bridges

Bridge Details

Structure #
181750057401016
Year Built
2019
Length
54.9 m (180.1 ft)
Max Span
21.3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
1,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.