BUS 45 over SH 31 & UP RR
BUS 45 AT SH 31 · County 349, Texas · Built 1999 · 4 Lanes · 6,730 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.092881, -96.458644
This bridge is in worse condition than 28.4% of bridges in County 349. The average bridge in Texas is 0 years old; this one is 27 years old.
Nearby Bridges
BUS 45 (7TH ST) over TOWN BRANCH
Built 1935
FM 709 over DRAW
Built 2008
N BUNERT ST over POST OAK CREEK
Built 1990
W 13TH AVE over MESQUITE BRANCH TRIB
Built 1930
W.11TH AVENUE over MESQUITE BRANCH TRIB
Built 1940
COMMERCE STREET over POST OAK CREEK
Built 1966
N. 3RD STREET over POST OAK CREEK
Built 1986
BUS 45 over POST OAK CREEK
Built 1930
N. BEATON STREET over POST OAK CREEK
Built 1991
BUS 45 (7TH ST) over MESQUITE CREEK
Built 1935
Bridge Details
- Structure #
- 181750009213352
- Year Built
- 1999
- Length
- 376.4 m (1234.9 ft)
- Max Span
- 30.5 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 4
- Daily Traffic
- 6,730
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $126,000
- Total Project Cost
- $158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.