SH 34 over Cottonwood Creek

1.2 Mi NE of FM 1390 · County 257, Texas · Built 2021 · 2 Lanes · 6,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

32.498847, -96.399022

This bridge is in worse condition than 41.7% of bridges in County 257. The average bridge in Texas is 0 years old; this one is 5 years old.

Nearby Bridges

Bridge Details

Structure #
181300017302333
Year Built
2021
Length
27.4 m (89.9 ft)
Max Span
27.1 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
6,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.