US 80 EBFR over BIG BRUSHY CREEK REL 2

1.60 MI W OF SP 557 · County 257, Texas · Built 1925 · 2 Lanes · 1,211 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
181300009504018
Year Built
1925
Reconstructed
1938
Length
42.7 m (140.1 ft)
Max Span
6.1 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
1,211
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.