STRAIT LN over TRIB GROVE CREEK

0.03 MI W OF TYLER ST · County 139, Texas · Built 2018 · 2 Lanes · 158 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
180710LY3079004
Year Built
2018
Length
7.9 m (25.9 ft)
Max Span
1.8 m
Width
18.6 m (61 ft)
Lanes
2
Daily Traffic
158
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.