FORRESTON ROAD over CHAMBERS CREEK TRIB
0.15 MI E OF JCT US 77 · County 139, Texas · Built 1970 · 2 Lanes · 163 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.256581, -96.862756
This bridge is in worse condition than 62.9% of bridges in County 139. The average bridge in Texas is 0 years old; this one is 56 years old.
Nearby Bridges
US 77 over MILL BRANCH
Built 1927
IH 35E ML over DRAINAGE DITCH
Built 2010
FM 329 over IH 35E MLS
Built 2010
HOLDER ROAD over CHAMBERS CREEK TRIB
Built 1993
IH 35E ML over DRAINAGE DITCH
Built 2010
BILL LEWIS (CR319) over IH 35E
Built 2010
IH 35E ML over DRAW
Built 2010
BILL LEWIS RD over CHAMBER CREEK TRIBUTARY
Built 1996
WRIGHT RD over CHAMBERS CRK TRIB
Built 1993
FORRESTON ROAD over ONION CREEK
Built 1963
Bridge Details
- Structure #
- 180710AA0320002
- Year Built
- 1970
- Length
- 14.9 m (48.9 ft)
- Max Span
- 7.3 m
- Width
- 6.7 m (22 ft)
- Lanes
- 2
- Daily Traffic
- 163
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.