FM 875 over SUTTON BRANCH
4.0 MI E OF FM 157 · County 139, Texas · Built 1957 · 2 Lanes · 4,092 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
32.412836, -97.019436
This bridge is in worse condition than 62.9% of bridges in County 139. The average bridge in Texas is 0 years old; this one is 69 years old.
Nearby Bridges
BRIANA DRIVE over SOUTH PRONG CREEK
Built 2020
FM 875 over SPRING BRANCH
Built 1957
POPPIE LANE over S PRONG CREEK TRIB.
Built 2021
S 14TH STREET over WAXAHACHIE CREEK TRIB.
Built 2018
ROSSVILLE DRIVE over WAXAHACHIE CR TRIB.
Built 2017
POWER WAY over SOAP CREEK
Built 2012
BRIGHTON DRIVE over WAXAHACHIE CREEK TRIB.
Built 2017
KELLEM LYNN DRIVE over S PRONG CREEK TRIB.
Built 2005
LAWSON FARMS DRIVE over WAXAHACHIE CR TRIB.
Built 2014
TIMBERCREST DR over WAXAHACHIE CREEK TRIB.
Built 2016
Bridge Details
- Structure #
- 180710081508015
- Year Built
- 1957
- Length
- 27.4 m (89.9 ft)
- Max Span
- 9.1 m
- Width
- 7.5 m (24.6 ft)
- Lanes
- 2
- Daily Traffic
- 4,092
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,000
- Total Project Cost
- $5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.