Union Park Blvd over Trib Simpson Branch

0.2 MI W of FM 1385 · County 121, Texas · Built 2019 · 4 Lanes · 1,250 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
180610ZA8960001
Year Built
2019
Length
13.4 m (44 ft)
Max Span
3 m
Lanes
4
Daily Traffic
1,250
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.