John Day Rd over Draw
3.2 MI S of SH 114 · County 121, Texas · Built 2019 · 2 Lanes · 4,400 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.005411, -97.358608
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
John Day Rd over Draw
Built 2019
John Day Rd over Elizabeth Creek Trib
Built 2019
John Day Rd over Trib Henrietta Creek
Built 2018
FM 156 over CHANNEL 155
Built 2010
FM 156 over CHANNEL 126
Built 2010
FM 156 over CHANNEL 170
Built 2010
FM 156 over CHANNEL 109
Built 2010
SKYTOP DR over CREEK
Built 2021
DIAMONDBACK LN over TRIB OF HENRIETTA CREEK
Built 2009
CROPOUT WAY over CREEK
Built 2021
Bridge Details
- Structure #
- 180610Z00320006
- Year Built
- 2019
- Length
- 6.7 m (22 ft)
- Max Span
- 1.8 m
- Width
- 33.4 m (109.6 ft)
- Lanes
- 2
- Daily Traffic
- 4,400
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.