Canyon Falls Dr over Trib Graham Branch

0.4 MI N OF CROSS TIMBERS · County 121, Texas · Built 2015 · 4 Lanes · 740 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
180610FF0010002
Year Built
2015
Length
11.3 m (37.1 ft)
Max Span
3 m
Lanes
4
Daily Traffic
740
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.