CR 335/MULKEY LANE over DRAW

1.0 MI W OF CLEVELAND GIB · County 121, Texas · Built 2006 · 2 Lanes · 10 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 7 Good

Location

33.084978, -97.252908

This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 20 years old.

Nearby Bridges

Bridge Details

Structure #
180610FF0010001
Year Built
2006
Length
42.7 m (140.1 ft)
Max Span
18.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
10
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$2,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.