Wichita Trail over Draw
0.7 MI W of Simmons Rd · County 121, Texas · Built 2014 · 2 Lanes · 3,510 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.021392, -97.100178
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 12 years old.
Nearby Bridges
Wisdom Creek Dr over Draw
Built 2003
WICHITA TRAIL over GRAPEVINE LAKE TRIBUTARY
Built 2002
Flower Mound Dr over Drain
Built 1999
Old Settlers Rd over Donald Branch
Built 2001
Steinbeck Cir over Drain
Built 2018
FLOWER MOUND RD over GRAPEVINE LAKE TRIBUTARY
Built 2011
Sagebrush Dr over Trib Donald Branch
Built 2000
Cardinal Dr over Grapevine Lake Trib
Built 2001
FM 2499 over DONALD BRANCH
Built 1996
FM 2499 over DRAIN
Built 1996
Bridge Details
- Structure #
- 180610E00710003
- Year Built
- 2014
- Length
- 14.6 m (47.9 ft)
- Max Span
- 7 m
- Width
- 20.5 m (67.3 ft)
- Lanes
- 2
- Daily Traffic
- 3,510
- Material
- Concrete
- Design
- Arch - Deck
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.