HEBRON PKWY over TIMBER CREEK

0.05 MI E OF IH 35E NBFR · County 121, Texas · Built 1986 · 7 Lanes · 18,751 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180610C00997001
Year Built
1986
Reconstructed
1997
Length
93 m (305.1 ft)
Max Span
29.9 m
Width
32.8 m (107.6 ft)
Lanes
7
Daily Traffic
18,751
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$224,000
Total Project Cost
$280,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.