FM 426 over PECAN CREEK

0.60 MI E OF US 77 · County 121, Texas · Built 1948 · 4 Lanes · 11,587 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
180610B11400001
Year Built
1948
Reconstructed
1970
Length
16.8 m (55.1 ft)
Max Span
5.2 m
Width
15.8 m (51.8 ft)
Lanes
4
Daily Traffic
11,587
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$5,000
Total Project Cost
$6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.