Copper Canyon Road over Poindexter Branch
1.36 MI North of FM 407 · County 121, Texas · Built 2013 · 2 Lanes · 5,394 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.091228, -97.109919
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 13 years old.
Nearby Bridges
BRANCH CROSSING over LOVING BRANCH
Built 2002
FM 407 over LOVING SPRING BRANCH
Built 2014
ESTATES DR over POINDEXTER BRANCH
Built 1971
Stacee Lane over Loving Branch
Built 2008
POST OAK LANE over LOVING BRANCH
Built 2004
CHINN CHAPEL RD over POINDEXTER BRANCH
Built 2006
HILLTOP ROAD over LOVING BRANCH
Built 2019
HICKORY HILL RD over LOVING BRANCH
Built 2008
FM 2499 SB over POINDEXTER CREEK
Built 2010
FM 2499 NB over POINDEXTER CREEK
Built 2010
Bridge Details
- Structure #
- 180610AA0467001
- Year Built
- 2013
- Length
- 21.5 m (70.5 ft)
- Max Span
- 2.4 m
- Width
- 13.6 m (44.6 ft)
- Lanes
- 2
- Daily Traffic
- 5,394
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.