STRADER RD over HOG BRANCH
0.40 MI E OF FM 156 · County 121, Texas · Built 2006 · 2 Lanes · 240 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
33.127806, -97.285356
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 20 years old.
Nearby Bridges
FM 156 over DENTON CREEK MAIN
Built 2009
TIM DONALD RD over DENTON CREEK
Built 2006
FM 156 over DENTON CREEK SLOUGH
Built 2009
TIM DONALD RD over DENTON CREEK TRIBUTARY
Built 1955
HOLDER RD over TRIB DENTON CREEK
Built 2007
N EVELYN LN over TRIB DENTON CREEK
Built 2007
GRASSLAND CT over DRAINAGE DITCH
Built 2018
EAKIN CEMETERY RD over DENTON CREEK TRIBUTARY
Built 2004
BLAIR RD over HOG BRANCH
Built 2005
ROBSON RANCH RD over DRAW
Built 2000
Bridge Details
- Structure #
- 180610AA0466001
- Year Built
- 2006
- Length
- 29 m (95.1 ft)
- Max Span
- 13.7 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 240
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.