FM 1385 over LITTLE ELM CREEK RELIEF
0.50 MI S OF FM 428W · County 121, Texas · Built 1955 · 2 Lanes · 7,607 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.284672, -96.892469
This bridge is in worse condition than 76% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 71 years old.
Nearby Bridges
FM 1385 over LITTLE ELM CREEK
Built 1955
FM 1385 over Little Elm Ck Tributary6
Built 1955
FM 428 over MUSTANG CREEK
Built 1990
FM 428 over PECAN CREEK
Built 1954
BRIDLE PATH PKWY over TRIB LITTLE ELM CREEK
Built 2020
FM 428 over DRAW
Built 1966
FM 1385 over MUSTANG CREEK
Built 2016
Lights Ranch Rd over Branch of Mustang Creek
Built 2014
SMILEY RD over DOE BRANCH
Built 2011
PARVIN RD over DOE BRANCH
Built 2005
Bridge Details
- Structure #
- 180610131501003
- Year Built
- 1955
- Length
- 38.1 m (125 ft)
- Max Span
- 7.6 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 7,607
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,000
- Total Project Cost
- $8,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.