FM 156 Northbound over Trail Creek
5 Miles N of SH 114 · County 121, Texas · Built 2019 · 2 Lanes · 5,963 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 7 | Good |
Location
33.056419, -97.300261
This bridge is in worse condition than 45.2% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 7 years old.
Nearby Bridges
FM 156 over DRAIN
Built 1994
VICTORY CIRCLE over DRAINAGE DITCH
Built 1996
Cedar Crest Dr over Trail Creek Trib
Built 2003
FM 156 Southbound over Trail Creek
Built 2019
Hardeman Blvd over Trail Creek Trib
Built 2003
BOSS RANGE RD over TRAIL CREEK
Built 2005
Allen Dr over Trail Creek Trib
Built 2003
HARMONSON ROAD over CATHERINE BRANCH
Built 2023
HARRIET CREEK DR over HARRIET CREEK
Built 2004
FM 156 SB over SH 114
Built 2018
Bridge Details
- Structure #
- 180610071801361
- Year Built
- 2019
- Length
- 50 m (164 ft)
- Max Span
- 16.8 m
- Width
- 11.8 m (38.7 ft)
- Lanes
- 2
- Daily Traffic
- 5,963
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.