SH 114 WB FR over MARSHALL BRANCH CREEK

1.50 MI E OF US 377 · County 121, Texas · Built 1994 · 3 Lanes · 4,227 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
180610035302223
Year Built
1994
Length
173.7 m (569.9 ft)
Max Span
24.4 m
Width
12.8 m (42 ft)
Lanes
3
Daily Traffic
4,227
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$44,000
Total Project Cost
$55,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.