SH 114 EB over BNSF RAILROAD
2.0 MI. W. OF FM 156 · County 121, Texas · Built 1997 · 2 Lanes · 19,841 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
33.035244, -97.341564
This bridge is in worse condition than 76% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 29 years old.
Nearby Bridges
SH 114 WB over BNSF RAILROAD
Built 2015
HARRIET CREEK DR over HARRIET CREEK
Built 2004
FM 156 over ELIZABETH CREEK
Built 2010
SH 114 over DRAW
Built 2017
FM 156 over CHANNEL 189
Built 2010
SH 114 EBFR over HARRIET CREEK
Built 2018
SH 114 WBFR over HARRIET CREEK
Built 2018
FM 156 over CHANNEL 170
Built 2010
John Day Rd over Elizabeth Creek Trib
Built 2019
SH 114 EB over ALLEN BRANCH
Built 2015
Bridge Details
- Structure #
- 180610035302089
- Year Built
- 1997
- Length
- 85.3 m (279.9 ft)
- Max Span
- 36.6 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 19,841
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.