IH-35E SB C-D over ELM FORK

0.8 MI. SE. OF SH 121 · County 121, Texas · Built 2017 · 3 Lanes · 57,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
180610019602492
Year Built
2017
Length
324.6 m (1065 ft)
Max Span
31.7 m
Width
15.2 m (49.9 ft)
Lanes
3
Daily Traffic
57,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.