IH 35E SB ML over FM 407

6.2 Mi NW of Sam Rayburn · County 121, Texas · Built 2017 · 4 Lanes · 59,197 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
180610019602451
Year Built
2017
Length
121.3 m (398 ft)
Max Span
44.5 m
Width
25.5 m (83.7 ft)
Lanes
4
Daily Traffic
59,197
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.