IH 35E SBML over TIMBER CREEK RELIEF

2.90 MI NW OF DALLAS C/L · County 121, Texas · Built 1983 · 7 Lanes · 70,035 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180610019602251
Year Built
1983
Reconstructed
2015
Length
182.9 m (600.1 ft)
Max Span
22.9 m
Width
32.8 m (107.6 ft)
Lanes
7
Daily Traffic
70,035
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.