FM 1171 over IH 35E
1.45 MI NW OF SH 121 BUS · County 121, Texas · Built 1954 · 6 Lanes · 15,972 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.046319, -97.008772
This bridge is in worse condition than 76% of bridges in County 121. The average bridge in Texas is 0 years old; this one is 72 years old.
Nearby Bridges
IH 35E over PRAIRIE CREEK
Built 1953
EDMONDS LN over TRIB OF TIMBER CR
Built 1978
Surf St over Timber Creek Trib
Built 1990
VALLEY RIDGE BL EB over IH 35E
Built 1990
FOX AVE & PED XING over IH 35E
Built 2017
VALLEY RIDGE BL WB over IH 35E
Built 1990
FOX AVE over TRIB OF TIMBER CR
Built 2008
Valley Ridge Blvd over Prairie Creek Trib
Built 1987
N SUMMIT AVE over TRIB OF PRAIRIE CR
Built 1996
N SUMMIT AVE over PRAIRIE CREEK
Built 1986
Bridge Details
- Structure #
- 180610019602056
- Year Built
- 1954
- Reconstructed
- 2017
- Length
- 61 m (200.1 ft)
- Max Span
- 25 m
- Width
- 23.7 m (77.8 ft)
- Lanes
- 6
- Daily Traffic
- 15,972
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $26,000
- Total Project Cost
- $33,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.