HICKORY TREE RD over HICKORY CREEK TRIB

0.45 MI S OF ELAM RD · County 113, Texas · Built 1958 · 2 Lanes · 1,983 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
180570N00500001
Year Built
1958
Length
8.5 m (27.9 ft)
Max Span
2.4 m
Width
18.1 m (59.4 ft)
Lanes
2
Daily Traffic
1,983
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.