KELLER SPRINGS RD over TRIB OF HUTTON BRANCH

1.1 MI E OF JOSEY LN · County 113, Texas · Built 1990 · 6 Lanes · 14,328 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
180570H01590001
Year Built
1990
Length
11.6 m (38.1 ft)
Max Span
3 m
Width
151.8 m (498 ft)
Lanes
6
Daily Traffic
14,328
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$5,000
Total Project Cost
$6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.